Glossary

Boiler Upgrade Scheme glossary

The scheme, the heat pump industry and the regulators each bring their own vocabulary. These are the terms you will meet in quotes, Ofgem emails and official guidance, defined in plain English and linked to the guide that explains each one.

Figures checked 28 September 2026 Sources listed at the end Published by an independent guide, not an installer

Terms, A to Z by topic

Grouped roughly as you meet them: the scheme and its process first, then the organisations, the technologies, the grant rules, and finally tax, planning and running costs.

Boiler Upgrade Scheme (BUS)
The government grant scheme in England and Wales that takes £7,500 off an air source or ground source heat pump (£9,000 in eligible off-gas oil and LPG homes), £2,500 off an air-to-air heat pump and £5,000 off a biomass boiler. Run by Ofgem for DESNZ.
Voucher
The grant, in the form Ofgem issues it to the installer after approving an application. It is valid for 3 months (6 for ground source).
Voucher redemption
The installer claiming the grant from Ofgem after the system is installed and commissioned. Ofgem then pays the installer.
Installer-led
The scheme’s design: the installer, not the property owner, applies for and redeems the grant. You cannot apply yourself.
Consent
Your confirmation, when Ofgem emails you, that the installer is applying on your behalf. Required within 14 days. It does not commit you to that installer.
Retrospective application
An application made after the system is commissioned. Allowed within 120 days of commissioning, but Ofgem warns it carries extra risk.
Ofgem
The energy regulator for Great Britain. It administers the Boiler Upgrade Scheme: approving vouchers, checking installations and paying installers.
DESNZ
The Department for Energy Security and Net Zero, which sets the scheme’s policy and eligibility rules and publishes its statistics.
MCS
The Microgeneration Certification Scheme. It certifies installers and products, issues the certificate for each installation and, since the April 2026 regulations, is the only certification the grant accepts.
MCS certificate
The document issued for a completed MCS installation. Keep it with your invoice and commissioning papers.
Certification body
The organisation that assesses an installer for MCS certification. Shown on the MCS installer search.
Consumer code
A code of practice approved by the government that installers working with consumers must belong to. For this scheme: RECC, HIES, or MCS’s own code (approved 1 June 2026).
RECC
The Renewable Energy Consumer Code — one of the consumer codes an installer can belong to.
HIES
The Home Insulation & Energy Systems Contractors Scheme — another approved consumer code.
Air-to-water heat pump (air source heat pump)
A heat pump that takes heat from outdoor air and puts it into water for radiators, underfloor heating and a hot-water cylinder. The most common grant-funded system.
Air-to-air heat pump
A heat pump that heats (and can cool) indoor air directly — what most reverse-cycle air conditioning units are. Funded at £2,500 in homes only, if it replaces the existing heating. Does not provide hot water.
Ground source heat pump
A heat pump that collects heat through pipes buried in trenches or a borehole. Same grant as air source; dearer to install.
Shared ground loop
One ground loop serving several properties, each with its own heat pump. Capacity limit 300kWth.
Hybrid heat pump
A heat pump working alongside a fossil fuel boiler. Not funded by the scheme.
Biomass boiler
A boiler burning wood pellets, chips or logs. Funded at £5,000 only in rural, off-gas properties with an emissions certificate; not in self-builds.
kWth
Kilowatts thermal — the heat output capacity of a system. Grant limits: 45kWth for a single system, 70kWth for multiple heat pumps.
SCOP
Seasonal coefficient of performance: the average heat a heat pump delivers per unit of electricity over a heating season. SCOP 3 means three kWh of heat per kWh of electricity.
Flow temperature
The temperature of the water a heating system sends to the radiators. Heat pumps are most efficient at lower flow temperatures, which is why radiators are sometimes upsized.
Heat-loss survey
A room-by-room calculation of how much heat a building loses, used to size the heat pump and radiators. Part of a proper MCS design.
Commissioning
Setting up and testing the installed system so it works as designed. The voucher must be redeemed after commissioning, within its validity period.
Off-gas grid
For the uplift: a property not fuelled by mains gas (a capped or clamped meter counts as gas), with no gas meter point on record, not on a heat network and not a new build.
Uplift (uplifted grant)
Ofgem’s term for the £9,000 grant for off-gas properties replacing oil or LPG, available for applications properly made from 21 July 2026 to 31 March 2027.
Capped or clamped meter
A gas meter that has been disconnected but not removed. It still counts as a mains gas connection for the uplift.
LPG
Liquefied petroleum gas, stored in a tank or bottles. Replacing an LPG system in an off-gas property qualifies for the higher grant.
Heat network
A system supplying heat to several buildings from a central source. A property attached to one is not off-gas for the uplift.
EPC
Energy Performance Certificate. No longer required for the grant since 28 April 2026; if one exists, the installer gives Ofgem its reference number.
Self-build
A home built by, or for, its first owner and never owned by a business. Eligible for £7,500, not the uplift and not biomass.
Permitted development (Class G)
In England, the right to install an air source heat pump on a house without a planning application, within limits including the MCS noise standard of 37.0 dB(A).
MCS 020 a)
The MCS planning standard for air source heat pumps, which sets the noise assessment method and limit used for permitted development in England.
VAT Notice 708/6
HMRC’s guidance on VAT for energy-saving materials. Heat pump installation in homes is 0% until 31 March 2027, then 5%.
Price cap
The maximum unit rates and standing charges suppliers can charge on default tariffs, set quarterly by Ofgem. Used on this site for running-cost examples.
Time-of-use tariff
An electricity tariff with cheaper rates at certain times. Heat-pump versions can cut running costs significantly, according to the Energy Saving Trust.
Home Energy Scotland Grant and Loan
Scotland’s heat pump support, separate from the Boiler Upgrade Scheme.

Missing a term? Use the form below to tell us and we will add it.

Sources for the figures on this page

  1. Ofgem — property owner guidance v5.1
  2. GOV.UK — Apply for the Boiler Upgrade Scheme
  3. legislation.gov.uk — SI 2026/390
  4. MCS — Microgeneration Certification Scheme
  5. HMRC — VAT Notice 708/6
  6. Energy Saving Trust — air source heat pumps

Read on 28 September 2026 unless the source line says otherwise. Scheme rules change: if a figure here disagrees with GOV.UK or Ofgem, the official page is right — tell us through the form and we will correct it.

Ask heat pump installers for quotes

Tell us a little about the property. We pass your enquiry to independent heat pump installers covering your postcode; they contact you directly, check your eligibility and, if you go ahead with an MCS-certified installer, they apply for the grant on your behalf. Check any installer on the MCS register before you sign. There is no charge to you for this.

What happens next

  1. We read your enquiry and check which kind of firm can help.
  2. We pass it to relevant independent firms that cover your postcode.
  3. They contact you with questions or a quote. You compare, and decide — with no obligation to go ahead.
Add a little more detail (optional — helps the right firm reply)

We share your details only with the firms we pass your enquiry to, and only for this enquiry. This site is an independent guide — not an installer, assessor or scheme administrator. See our privacy notice.

Check eligibility Get quotes
Request quotes